- The first problem was that our female actor was not able to be filmed for reason i don't no
- The second was that the weather was to windy and wet so our props would get ruined and the generator would not be able to run.
- One of the cameras were malfunctioning not giving us the quality we wanted.
- one of the team did'nt show up Pat Henbury
Friday, 27 November 2009
More problems
We came across some more problems to film on the 25-26 November 2009
Main Story Line
The main story line to our intro of the film will be explained through out the rest of film, the story is of a woman walking through the forest and coming across two men burying a body, the next scene will be going back in time 12 hours to the start of the plot, it will gradually progress to the first scene again, this will be in the middle of the story then the next scenes of her running from these people and hiding, however these men know what she has done and end up hunting and killing her, leaving a dramatic twist to the story.(Alex Mutu, Pat Henbury & Alex Diss)
Friday, 20 November 2009
Filming Part 1 (Thursday 19th November)
- We were able to film at night time due to a good set of equipment provided by Alex Diss. This included lights, spades and a generator.
- The generator however did cause a problem as it made a lot of noise in the background.
- The part the group filmed was the burial and the digging of the hole.
- We were not able to film the part with the woman in because the actress was not available.
- The weather was good and we used a smoke machine in place of actual fog.
- Unfortunately Daniel Atkinson was not avalible to film so Anton took his place.
PART 1 FILMING BY Alex Diss, Alex Mutu and Anton Heil
Tuesday, 17 November 2009
Problems/Changes Throughout the Project
- Weather: Monday the 16th November we were going to go out to Hedingham and explore possible settings. We could not do this due to rain.
- We had planned to film on Wednesday 18th November but due to certain actors not being available we changed the date to Thursday 19th.
- Even on Thursday we had to use some members of the group to act as again other actors weren't available. Anton will now have to be used in all the shots he is needed.
(Pat Henbury, Anton Heil)
Monday, 16 November 2009
Planned Actors/Actresses
Planned Settings
- Woods around Hedingham
- The silent study room within Hedingham School
(Patrick H, Anton H)
Costume & Props planning
- 2 hats (Anton,
- 2 trench coats
- body bag
- spade (Anton, Alex M.)
- smoke machine (Alex D.)
- lights (Alex D.)
Monday, 9 November 2009
Schedule
- We are planning to meet at Alex' house on the next weekend to start filming.
- The last scene of our film is the only one we can film in the school during this week.
- On friday the 13th November we filmed the last shot of our film in the school. We used the silent study room as our location. Mairyn Heather was our actress and she's going to act as the main character in our film.
- The rest of our film from here on out will be filmed within the woods. These woods are located in Hedingham.
- After school on Wednesday the 18th November we are going to film the first part of our film.
(Alex M, Anton H, Alex D, Patrick H)
Thursday, 5 November 2009
Storyboard
Wednesday, 4 November 2009